'TINA H.' MINE
Mule Creek District
July 14, 1905: “All of the sawmill machinery has been delivered at the Tena H. mine in the Mule Creek district and is now being installed.” (The Glendale News)
August 25, 1905: “At the Tena H. mine, where work has been carried on at a rapid rate, the ore is becoming richer for every foot in depth. The contract has been let for 100,000 feet of logs for the erection of the sawmill, the machinery for which is already on the ground. And a flume about 950 feet in length has been placed.” (The Glendale News)